Commercial Solar Project:
H.E. Burns and Sons Seven Hills

Project Summary

98.28kW solar power system installed at Seven Hills NSW
Play Video

Project Background

The client wanted to save on power costs together with offsetting their carbon footprint.

Like many businesses, H.E Burns and Sons has experienced an increase in power costs. It’s also been necessary to contribute to a greener future.

We elected to use Goodwe Inverters as the client was after a robust and reliable inverter brand. Their main focus was to reduce costs as efficiently as possible.

The objective was to utilise the available roof space to offset as much power consumption as possible with the 100kW STC limit and leave roof space for an additional 100kW solar system projected to be installed in the near future.

Project Outline

We elected to use Goodwe Inverters as the client was after a robust and reliable inverter brand. Their main focus was to reduce costs as efficiently as possible.

The objective was to utilise the available roof space to offset as much power consumption as possible with the 100kW STC limit and leave roof space for an additional 100kW solar system projected to be installed in the near future.

Estimated Savings from Solar

The Solahart system is estimated to offset 80% of their annual electricity consumption, and an ROI of 3 years. Offset of up to 121,500kgs of CO2 per year.

Total estimated savings of $715k over 25 years.